Five Billion Pound Super Sewer

Catching up on Five Billion Pound Super Sewer?

Don't want to miss an episode anymore? Set up a free alarm and receive an email when new episodes are available. Handy!

October 2021
Expired
In this third and final episode of the series, tunnelling in central London finally begins. To complete the 16 mile main section of the super sewer, four bespoke tunnelling machines have been designed, and work is underway to prepare for their launch.
Expired
In this second episode, construction begins in the heart of London. Two key connection shafts along the Thames are to be dug to enable the super sewer to be built. In Battersea, a challenging construction technique called 'diaphragm-walling' is being employed to build a massive 90 metre deep shaft. But these are the deepes...
Expired
We follow the creation of the first stretch of the super sewer in East London. Lead engineer Emmanuel Costes has to build a massive 80 metre deep shaft that connects to the super sewer - and make it watertight using a specialist technique called ‘slipform’. It’s a risky approach, as it involves pouring concrete constantly ...
Archive